Infrastructure Footprint

Geographically Distributed. Centrally Orchestrated.

Four active U.S. sites. One unified control plane.

From 10 MW edge sites to 60 MW flagship facilities, every location runs the same automation stack, telemetry agents, and operational playbooks. This distributed footprint reduces single-site risk while allowing each region to optimize around local power conditions, climate, and thermal strategy.

Total orchestrated capacity:
130 MW
All sites active, staffed, and under real-time orchestration.
Tennessee
20 MW
Thermal optimization site with cooling efficiency 22% above regional baseline.
Arkansas
60 MW
Flagship 60 MW site with full automation and on-site engineering support.
U.S. Infrastructure Map
Ohio
10 MW
Remote-capable edge site with automated dispatch and minimal on-site footprint.
Kentucky
40 MW
Hybrid containerized and building-based site with predictive health fully active.
Unified Control Plane

One Control Plane Across 4 States

Geographic distribution does not mean operational fragmentation. All four sites connect to the same central orchestration platform, which maintains:

Control Plane Icon
Centralized configuration management for all 39,000 compute nodes
Remote firmware and tuning deployment without truck rolls
Site-local edge agents that continue operating even during WAN interruptions
Unified alerting and dispatch logic that treats all sites as a single fleet
Site Instrumentation

Every Site, Fully Instrumented

Each facility in our footprint is equipped with the same core technical capabilities, regardless of size or age:

01

Power Intelligence

Rack-level power draw monitoring. Real-time circuit load tracking. Automated throttling on overcurrent events.

02

Thermal Mapping

Inlet/outlet temperature per node. Cooling efficiency scoring. Automated fan curve adjustments.

03

Network Observability

Switch-level telemetry. Packet loss and latency baselining. Automated link failover.

04

Dispatch Readiness

Each site is equipped with mobile-first work order tools for on-site engineers, with relevant node data delivered before they arrive.

Planned Expansion

Hash Robot is actively evaluating additional sites in ERCOT and PJM regions for 2026–2027 deployment. Partners interested in co-location or build-to-suit arrangements may contact our infrastructure team directly.